Case Study
Case Study
The Langdon Apartments - Rapid Design &...
Having made the switch to FRAMECAD’s automated construction system in April 2016; prefabricated...
Case Study
SBS Group Vic Portfolio
Some of the Great Projects completed by the SBS Group using the FRAMECAD System
Case Study
Innovative Floor Cartridge Installation by...
When it comes to designing, prefabricating, and delivering cold formed steel(CFS) wall frames,...
Case Study
FRAMECAD by Douglass Colony: Hyatt Place...
A 6-level, 156-room hotel project. All 644 wall panels for this project were erected in just 17...
Case Study
Dynamic Steel Frame - Creating Australia’s...
With a floor area of 3200sqm and a total of over 80 tonnes of steel used, the Zinnia Apartments...
Case Study
Olympic Games Rio 2016 - TV TOWER at the...
GypSteel, used the FRAMECAD technology to build the TV tower at the Olympic Park, housing studios...
Case Study
Mariposa VII FRAMECAD by Douglass Colony,...
The latest Douglass Colony building project, Mariposa VII, a 7-story multi-family project...
Case Study
Rio 2016 Olympic City Building Being Built -...
Watch as part of the Rio 2016 Olympics comes to life through this timelapse video. The building...
Case Study
Build Back Better - reconstruction of a school...
This school and community had the large project to rebuild the school and associated buildings...
Case Study
Dynamic Steel Frame - Creating Australia’s...
With a floor area of 3200sqm and a total of over 80 tonnes of steel used, the Zinnia Apartments...
Case Study
Intellisteel’s onsite methodology successfully...
In the US, the framing industry is changing rapidly. Concrete contractors are becoming a rarity...